November 2019

Lindero Project fresh water well
Lindero Project fresh water well
Lindero Project fresh water well: Water pipes and pumping system
Lindero Project fresh water well: Water pipes and pumping system
Lindero Project fresh water well: Water pipes and pumping system
Lindero Project fresh water well: Water pipes and pumping system
Panoramic view of truck shop
Panoramic view of truck shop
Truck shop: Electric room foundation work
Truck shop: Electric room foundation work
Repair shop structure erection
Repair shop structure erection
Repair shop structure erection
Repair shop structure erection
Panoramic view of truck shop
Panoramic view of truck shop
Truck shop: Electric room foundation work
Truck shop: Electric room foundation work
Truck shop: Entrance door installation work
Truck shop: Entrance door installation work
Repair shop: Structure erection
Repair shop: Structure erection
Repair shop: Structure erection
Repair shop: Structure erection
Repair shop: Structure erection
Repair shop: Structure erection
Chemical lab
Chemical lab
Chemical lab: Mine sample room
Chemical lab: Mine sample room
Chemical lab: Wet process room
Chemical lab: Wet process room
Chemical lab: Fire test room
Chemical lab: Fire test room
Chemical lab: Office
Chemical lab: Office
Chemical lab: Instrumentation room
Chemical lab: Instrumentation room
Chemical lab: Hallway
Chemical lab: Hallway
Chemical lab: Kitchen
Chemical lab: Kitchen
Samples deposit: Cladding work
Samples deposit: Cladding work
Samples deposit: Cladding work
Samples deposit: Cladding work
Samples deposit: Cladding work
Samples deposit: Cladding work
Samples deposit: Cladding work
Samples deposit: Cladding work
Samples deposit: Cladding work
Samples deposit: Cladding work
Samples deposit: Cladding work
Samples deposit: Cladding work
Samples deposit: Cladding work
Samples deposit: Cladding work
Samples deposit: Cladding work
Samples deposit: Cladding work
Samples deposit: Structure erection work
Samples deposit: Structure erection work
Samples deposit: Structure erection work
Samples deposit: Structure erection work
Panoramic view of the Lindero camp
Panoramic view of the Lindero camp
Panoramic view of Lindero camp
Panoramic view of Lindero camp

October 2019

Panoramic view of the truck shop
Panoramic view of the truck shop
Truck washer foundation work
Truck washer foundation work
Truck shop: Cladding work
Truck shop: Cladding work
Truck shop: Cable rack installation work
Truck shop: Cable rack installation work
Panoramic view of power plant
Panoramic view of power plant
ADR and SART plants´ sample deposit structure erection work
ADR and SART plants´ sample deposit structure erection work
Panoramic view of the truck shop
Panoramic view of the truck shop
Panoramic view of the truck shop
Panoramic view of the truck shop
Inside view of the truck shop
Inside view of the truck shop

September 2019

Panoramic view of the truck shop
Panoramic view of the truck shop
Panoramic view of the truck shop
Panoramic view of the truck shop
Chemical lab roof sealing work
Chemical lab roof sealing work
Chemical lab roof sealing work
Chemical lab roof sealing work
Chemical lab roof sealing work
Chemical lab roof sealing work
Jump ramp stackers installation work
Jump ramp stackers installation work
Panoramic view of the truck shop
Panoramic view of the truck shop
Truck shop floor concrete pour work
Truck shop floor concrete pour work
Tire workshop concrete work completed
Tire workshop concrete work completed
Chemical lab steel cladding work completed
Chemical lab steel cladding work completed
Chemical lab steel cladding work completed
Chemical lab steel cladding work completed
Panoramic view of the 8 MW power plant
Panoramic view of the 8 MW power plant
Panoramic view of the truck shop and camp facilities
Panoramic view of the truck shop and camp facilities
Panoramic view of camp facilities
Panoramic view of camp facilities

August 2019

Panoramic view of the truck shop
Panoramic view of the truck shop
Truck shop bridge crane installation work
Truck shop bridge crane installation work
Chemical lab steel cladding work
Chemical lab steel cladding work
Chemical lab interior cladding work
Chemical lab interior cladding work
Chemical lab steel cladding work
Chemical lab steel cladding work
Chemical lab steel cladding work
Chemical lab steel cladding work
Chemical lab steel cladding work
Chemical lab steel cladding work
Truck shop bridge crane installation work
Truck shop bridge crane installation work
Truck shop bridge crane installation work
Truck shop bridge crane installation work
Truck shop floor concrete pour work
Truck shop floor concrete pour work
Truck shop floor concrete pour work
Truck shop floor concrete pour work
Chemical lab steel structure installation work
Chemical lab steel structure installation work
Chemical lab steel structure installation work
Chemical lab steel structure installation work
Chemical lab steel structure installation work
Chemical lab steel structure installation work
Chemical lab steel structure installation work
Chemical lab steel structure installation work
Panoramic view of the power plant
Panoramic view of the power plant
Aqueduct: Water wells
Aqueduct: Water wells
Aqueduct: Intermediate pumping station
Aqueduct: Intermediate pumping station
Panoramic view of the camp
Panoramic view of the camp
Panoramic view of the camp
Panoramic view of the camp
Panoramic view of the warehouse
Panoramic view of the warehouse

July 2019

Panoramic view of the power plant
Panoramic view of the power plant
Panoramic view of jump ramp stackers
Panoramic view of jump ramp stackers
Jump ramp stackers installation work
Jump ramp stackers installation work
Jump ramp stackers installation work
Jump ramp stackers installation work
Dining facility
Dining facility
Truck shop cladding work
Truck shop cladding work
Truck shop cladding work
Truck shop cladding work
Truck shop cladding work
Truck shop cladding work
Truck shop cladding work
Truck shop cladding work
Truck shop cladding work
Truck shop cladding work
Truck shop cladding work
Truck shop cladding work
Chemical lab structure installation work
Chemical lab structure installation work
Chemical lab structure installation work
Chemical lab structure installation work
Chemical lab structure installation work
Chemical lab structure installation work
Chemical lab foundation work
Chemical lab foundation work
Chemical lab foundation work
Chemical lab foundation work
Panoramic view of the warehouse
Panoramic view of the warehouse
Power plant electrical room interior
Power plant electrical room interior
Power plant electrical room interior
Power plant electrical room interior
Power plant electrical room installation work
Power plant electrical room installation work

June 2019

Panoramic view of the camp facilities
Panoramic view of the camp facilities
Truck shop cladding work
Truck shop cladding work
Truck shop cladding work
Truck shop cladding work
Truck shop cladding work
Truck shop cladding work
Truck shop cladding
Truck shop cladding
Truck shop cladding
Truck shop cladding
Truck shop cladding
Truck shop cladding
Truck shop cladding
Truck shop cladding
Truck shop cladding
Truck shop cladding
Truck shop cladding
Truck shop cladding
Truck shop cladding
Truck shop cladding
Truck shop cladding
Truck shop cladding
Truck shop steel erection
Truck shop steel erection
Truck shop steel erection
Truck shop steel erection
Truck shop steel erection
Truck shop steel erection
Truck shop steel erection
Truck shop steel erection
Truck shop steel erection
Truck shop steel erection
Chemical lab foundation work
Chemical lab foundation work
Chemical lab foundation work
Chemical lab foundation work
Chemical lab foundation work
Chemical lab foundation work
Medium voltage overhead powerline
Medium voltage overhead powerline
Power plant: Medium voltage overhead powerline
Power plant: Medium voltage overhead powerline
Power plant: Electric power transformers
Power plant: Electric power transformers
Power plant: Electric power transformers
Power plant: Electric power transformers
Power plant: Fuel storage tanks
Power plant: Fuel storage tanks
Power plant: Modularized gensets
Power plant: Modularized gensets
Power plant: Modularized gensets
Power plant: Modularized gensets
Power plant: Shelter installation
Power plant: Shelter installation
Power plant: Shelter installation
Power plant: Shelter installation
Power plant panoramic view
Power plant panoramic view
Power plant: Electrical connection work
Power plant: Electrical connection work
Power plant generators
Power plant generators
Power plant: Light installation
Power plant: Light installation
Power plant: Light installation
Power plant: Light installation
Power plant: Diesel oil storage tanks
Power plant: Diesel oil storage tanks
Camp facilities
Camp facilities

May 2019

Site infrastructure (looking east)
Site infrastructure (looking east)
Warehouse
Warehouse
Warehouse
Warehouse
Camp infrastructure
Camp infrastructure
Camp infrastructure
Camp infrastructure
Camp infrastructure
Camp infrastructure
Truck shop
Truck shop
Truck shop contractor workers
Truck shop contractor workers
Truck shop steel erection
Truck shop steel erection
Truck shop steel erection
Truck shop steel erection
Truck shop steel erection
Truck shop steel erection
Power supply
Power supply
Power plant
Power plant
Power plant
Power plant
Power plant contractor team
Power plant contractor team
Power plant
Power plant
Power plant
Power plant
Power plant
Power plant
Power plant
Power plant

April 2019

Electric power plant
Electric power plant
Electric power plant
Electric power plant
Electric power plant
Electric power plant
Electric power pole installation
Electric power pole installation
Electric power pole installation
Electric power pole installation
Electric power pole installation
Electric power pole installation
Electric power pole installation
Electric power pole installation
Camp (lookiing north from Lindero deposit)
Camp (lookiing north from Lindero deposit)
Camp infrastructure
Camp infrastructure
Camp infrastructure
Camp infrastructure
Installing gas supply for camp canteen
Installing gas supply for camp canteen
Camp canteen
Camp canteen
Warehouse area
Warehouse area
Future airstrip
Future airstrip

March 2019

Permanent and Temporary camps
Permanent and Temporary camps
Power plant
Power plant
Laydown area
Laydown area
Mining fleet operator training area
Mining fleet operator training area
Mining fleet operator training
Mining fleet operator training
Camp and truck shop (looking north from Lindero deposit)
Camp and truck shop (looking north from Lindero deposit)

February 2019

Power plant site preparation
Power plant site preparation
Power plant site preparation
Power plant site preparation
Power plant site preparation
Power plant site preparation

January 2019

View of camp
View of camp
View of camp
View of camp
View of camp
View of camp
Permanent camp - dining room construction
Permanent camp - dining room construction
Power plant site preparation
Power plant site preparation
Power plant site preparation
Power plant site preparation
Storage of equipment and material on future permanent warehouse location
Storage of equipment and material on future permanent warehouse location
Mining fleet operator training
Mining fleet operator training
Mining fleet operator training
Mining fleet operator training

December 2018

View of camp
View of camp
Water tank
Water tank
Power plant site concrete platforms
Power plant site concrete platforms
Power plant site preparation
Power plant site preparation
Power plant site preparation
Power plant site preparation
Power plant site preparation
Power plant site preparation
Power plant site preparation
Power plant site preparation
Truck shop site foundation concrete pour
Truck shop site foundation concrete pour
Truck shop site foundation concrete pour
Truck shop site foundation concrete pour
Truck shop site foundation concrete pour
Truck shop site foundation concrete pour
Truck shop site foundation concrete pour
Truck shop site foundation concrete pour
Temporary truck shop
Temporary truck shop

November 2018

Power plant site preparation
Power plant site preparation
Power plant site preparation
Power plant site preparation
Truck shop earthworks
Truck shop earthworks
Truck shop earthworks
Truck shop earthworks
Water tank installation
Water tank installation
Water treatment plant
Water treatment plant
On-site mine equipment assembly
On-site mine equipment assembly
On-site mine equipment assembly
On-site mine equipment assembly
On-site mine equipment assembly
On-site mine equipment assembly
On-site mine equipment assembly
On-site mine equipment assembly
Camp construction
Camp construction
Camp construction (looking south towards LIndero deposit)
Camp construction (looking south towards LIndero deposit)
Camp construction and truck shop (looking north from Lindero deposit)
Camp construction and truck shop (looking north from Lindero deposit)
Warehouse construction (looking northeast from Lindero deposit)
Warehouse construction (looking northeast from Lindero deposit)
On-site mining equipment temporary garage
On-site mining equipment temporary garage

October 2018

Camp construction
Camp construction
Concrete batch plant erection
Concrete batch plant erection
Camp construction
Camp construction
Truck shop construction
Truck shop construction

September 2018

Water tank construction
Water tank construction
Camp ground work
Camp ground work
Camp ground work
Camp ground work
Camp ground work
Camp ground work
Camp ground work
Camp ground work
Camp ground work
Camp ground work
Camp construction
Camp construction
Camp construction
Camp construction

August 2018

Permanent camp site
Permanent camp site
Temporary camp site pad
Temporary camp site pad
Temporary dining area
Temporary dining area
Temporary dining area
Temporary dining area

July 2018

Permanent camp site
Permanent camp site
Permanent camp site
Permanent camp site
Contractor temporary camp
Contractor temporary camp
Camp water well
Camp water well
Camp water well
Camp water well
Gas tank platform concrete works
Gas tank platform concrete works
© 2019 Fortuna Silver Mines Inc.
All rights reserved.
Disclaimer